Contact us About us News far fa-map-marker-alt Find a Branch far fa-phone-alt 13 15 52 far fa-user-alt Coates Connect far fa-shopping-cart Hire Now

Equipment for Hire

Access Earthmoving Lift & Shift Site Accommodation Air & Air Accessories Floor & Cleaning Lighting Tools & Equipment Compaction Generators & Power Distribution Materials Handling Traffic Management Concrete & Masonry Heating, Ventilation & Air Conditioning Pipeline Testing Trucks Vehicles & Trailers Confined Space Entry Ladders & Scaffolding Propping & Structural Support Water Management & Pumps Construction Lasers Landscaping Shoring Welding
Equipment for Hire
Access Earthmoving Lift & Shift Site Accommodation Air & Air Accessories Floor & Cleaning Lighting Tools & Equipment Compaction Generators & Power Distribution Materials Handling Traffic Management Concrete & Masonry Heating, Ventilation & Air Conditioning Pipeline Testing Trucks Vehicles & Trailers Confined Space Entry Ladders & Scaffolding Propping & Structural Support Water Management & Pumps Construction Lasers Landscaping Shoring Welding View all

Engineering Solutions

Design & Installation Water Management Structural Support Traffic Management BIM Library
Engineering Solutions
Design & Installation Water Management Structural Support Traffic Management BIM Library View all Engineering Solutions

Industrial Solutions

Site Management Equipment & Services Technology & Innovation Industry Sectors
Industrial Solutions
Site Management Equipment & Services Technology & Innovation Industry Sectors View all Industrial Solutions

Power & HVAC

Power Heating Ventilation Air Conditioning Compressed Air Service and Support
Power & HVAC
Power Heating Ventilation Air Conditioning Compressed Air Service and Support View all Power & HVAC Solutions
fas fa-bars Access Air & Air Accessories Compaction Concrete & Masonry Confined Space Entry Construction Lasers Earthmoving Floor & Cleaning Generators & Power Distribution Heating, Ventilation & Air Conditioning Ladders & Scaffolding Landscaping Lift & Shift Lighting Materials Handling Pipeline Testing Propping & Structural Support Shoring Site Accommodation Tools & Equipment Traffic Management Trucks Vehicles & Trailers Water Management & Pumps Welding View all BIM Library Design & Installation Structural Support Traffic Management Water Management View all Engineering Solutions Equipment & Services Industry Sectors Site Management Technology & Innovation View all Industrial Solutions Compressed Air Heating Ventilation Air Conditioning Power Service and Support View all Power & HVAC Solutions far fa-shopping-cart Hire Now far fa-user My Coates Hire far fa-map-marker-alt Find a branch far fa-phone 13 15 52 Contact us About us News

Degraded manhole upgraded in live wastewater environment

Bespoke shoring and water management solution supports safe excavation and construction

 
The project


South Australia Water needed to relocate a sewer access point on Regency Road in Adelaide’s northern suburbs. The work formed part of the Department of Planning Transport and Infrastructure’s (DPTI) $354.3 million Regency Road to Pym Street (R2P) Project, designed to ease congestion for commuters.

SA Water engaged Fulton Hogan to deliver the works, first decommissioning the degraded underground manhole, then constructing a new and more durable access point five metres upstream. 

Coates Engineering Solutions was appointed to deliver a turnkey temporary works, water management and equipment hire solution to support Fulton Hogan in completing the complex two-stage scheme of works.

Fulton Hogan water management
The challenge


One of the most challenging aspects of this project was working safely and efficiently in live operating environments. 

“All of the excavation and construction work was performed in a confined, live wastewater environment, with flows up to 600L per second moving through the sewer trunk main,” says Scott Stanley, Product Specialist - Pumps, Traffic, Shoring & Lift & Shift at Coates. “The excavation site also sat alongside a busy road, just metres away from a major transport project, so there were significant hazards in all directions.”

The degradation of the existing manhole and fragility of the trunk main also presented serious safety and environmental hazards for the project team and the surrounding area, should damage have occurred during decommissioning or construction.

The need for one large, safe excavation space to accommodate both stages of works also complicated project delivery and demanded a high degree of precision from the temporary works.

 

The solution

 

Coates Engineering Solutions partnered with Fulton Hogan to support safe excavation and to create a safe working space for decommissioning the existing manhole and constructing a new sewer access point. 

Temporary works

To support excavation in this limiting environment, Coates Engineering Solutions designed a shoring box and structural propping solution that allowed for maximum working room, with the smallest possible footprint. This bespoke solution also accommodated the careful placement of two 48-tonne concrete blocks on either side of the trunk main to reinforce the new access point.

Fulton Hogan temporary works

Water management

Coates Engineering Solutions supplied water management equipment and the design of a contingency sewer bypass solution for the access point relocation project. “This bypass solution needed to be easy to install at a moment’s notice, and capable of accommodating the trunk main’s high flows,” says Scott. “Although this solution was never activated, Fulton Hogan and SA Water had the assurance of knowing that a mitigation strategy was in place, along with all of the necessary equipment and a full on-site support team ready to execute the bypass if it was required.”

On-site supervision

Qualified technical support was available at all times during temporary works installation.

Hire equipment 

Coates also supplied a wide range of quality earthmoving, confined space entry and traffic management equipment to support project delivery.

 
The impact

 

The design and installation of temporary works by Coates Engineering Solutions created a safe working environment for the project team, and allowed construction work to be safely and efficiently completed. With the Regency Road sewer access point relocation now complete, road works can continue on the R2P scheme.
 
“Having already worked together to deliver several high-risk major infrastructure projects, Fulton Hogan knew that Coates Engineering Solutions could bring a high level of expertise and professionalism to this project,” says Scott. “During planning we attended and contributed to risk management discussions, and provided valuable engineering support to influence the overall design”. 

In choosing a project partner, Fulton Hogan was looking for much more than an equipment hire specialist. 

“Fulton Hogan wanted an experienced solutions provider, and the backing of a professional team that could work alongside them in delivering this complex project,” says Scott. “They knew what Coates Engineering Solutions could deliver, and that it would be a positive experience to partner together again.”

 

Discover how Coates can deliver a tailored temporary works solution for your next project. Call 13 15 52 or contact the team

 

SHARE THIS ARTICLE

{{ socialIcon(api.type) }} {{ socialIcon(api.type) }} {{ socialIcon(api.type) }}
Find out how we can help with your project fas fa-phone-alt CALL US 13 15 52 Submit Enquiry

By submitting this enquiry you agree to Coates's Communications Terms & Conditions

Give us a call
fas fa-phone-alt 13 15 52 fas fa-check Australia’s largest fleet fas fa-check National branch network fas fa-check Friendly & reliable service fas fa-check End-to-end solutions
far fa-times-circle Your enquiry has been submitted

Thank you for your enquiry. One of our team members will get back to you as soon as possible.